Tribal Welfare Engineering

  • Engineering wing headed by Chief Engineer was established in 1984-85
  • During bifurcation of the State, the post of Engineer-in-Chief was allotted to the State of Andhra Pradesh, as such the post of Chief Engineer is fallen vacant in the State Telangana.
  • Presently Tribal Welfare Engineering Wing is headed by Deputy Chief Engineer since 02.06.2014.
  • In Telangana State, the Engineering Department is serving with (2) circles headed by Superintending Engineers, (04) divisions headed by Executive Engineers (13) sub divisions headed by Dy. Executive Engineers with the support of (47) section officers (i.e., Assistant Engineers / Assistant Executive Engineers)
  • Tribal Welfare Engineering department up the infrastructure facilities like Roads, Buildings and Drinking Water under various schemes.

Buildings

  • Providing under Building for School complexes and Educational Infrastructure to (279) Ashram Schools / Residential Schools, (379) works such as provision of Dormitories, Kitchen cum dining halls, Toilet blocks, Staff Quarters etc., have been taken up with estimated cost of Rs.28576 lakhs out of which (245) works have been completed so far with an expenditure of Rs.14866.57 lakhs during 2014-15 and (134) works are in progress.
  • (107) Post Matric Hostels taken up with estimated cost of Rs.11200 lakhs and (37) works are completed, and the expenditure incurred so far Rs.4214.04 lakhs
  • (20) Youth Training Centre works are taken up with an estimated cost of Rs.6980 lakhs and (9) works are completed, the expenditure incurred so far Rs.3815.86 lakhs
  • Infrastructure facilities to (29) Ashram Schools converted from hostels are taken up with an estimated cost of Rs.2900 lakhs & (16) are completed, the expenditure incurred so far Rs.1574.97 lakhs
  • (53) Staff quarters in Ashram Schools are taken up with an estimated cost of Rs.1590.00 lakhs
  • (2) B.Ed/D.Ed College works taken up with an estimated cost of Rs.270 lakhs and (1) completed and one work progress and expenditure incurred so far Rs.226.09 lakhs
  • Other (43) works like improvement to PMRC, ITDA Offices, ATWO Offices & Staff Quarters to ITDA head quarters etc., taken up with an estimated cost of Rs.2275 lakhs.
Engineering College
  • (1226) Additional class rooms in (218) Ashram Schools with an estimated cost Rs.6484.20 lakhs are taken up under SSA & (189) works are completed and the expenditure Rs.4895.97 lakhs
  • Additional Infrastructure facilities to Ashram Schools and Hostels such as Additional Dormitories and Dining & kitchen etc., (108) works with an estimated cost of Rs.9356 lakhs under NABARD programme (BIRS) are taken up & (68) works are completed and the expenditure incurred so far Rs.4908.03 lakhs

Roads

  • (27) Road works taken up under NABARD Programme with an estimated cost of Rs.4392.00 lakhs out of which (23) works completed with an expenditure Rs.3296.84 lakhs
  • Tribal festival such as Medaram Jathara in Warangal district is being conducted. In the festival facilities such as provision of Drinking water & development of car tracks and improvement of existing gravel roads to BT Roads etc., were taken. Such (14) works were taken with an estimated cost of Rs.799.00 lakhs and completed in Feb 2014.
  • (42) Works are taken up under LWE programme in Khammam district with an estimated cost of Rs.21079.00 lakhs and (42) works are completed with an expenditure Rs.20012.47 lakhs.

Drinking Water

  • Under 13th Finance Commission grant (727) works with an cost of Rs.4523 lakhs are taken up by Tribal Welfare Department and (311) No. of works with Rs.5460 lakhs is taken up by under RWS Department in Tribal areas.

Tribal Welfare Engineering progress in 2014-15